Featured post

2018 North American International Auto Show Coverage

This year's North American International Auto Show was better than ever!  The atmosphere was positive, the displays were extravagant, a...

Friday, 21 February 2014

Camaro Update: 2/21/2014 - More parts arrived


AFR - Airflow Research 6723 - AFR CNC Engraved Aluminum Valve Covers 

 Another shipment of parts arrived the other day, including my sweet looking AFR black powder coated valve covers. I also got a new flexplate, bolts, and a few other small items. In addition, my AFR stud girdle nuts are on the way from California, so I can tie the studs together and not worry about those 7,200 rpm shifts.


I shipped my Coan converter out to Coan a couple days ago, and should be hearing from them soon as to whether or not it needs anything beyond a flush and inspection after being cut open.

I've not had a chance to actually work on the car really, but all the parts will be ready to go, so when I get a few days, I should be able to make some serious progress.  My goal is to have the transmission back together by the end of March, tackling a little at a time.  Once complete, the engine, torque converter, and trans will all be ready to drop in. After that, everything else is a cake walk.  My furlough this year is in June, and my plan is to have this car on the road, bug free, and ready to race.

No comments:

Post a Comment